Home › EV charging › Oregon › Jeep Recon

Cost to charge a 2026 Jeep Recon in Oregon: $87/month

Charging a 2026 Jeep Recon at home in Oregon costs about $87 per month ($1,048 per year) for 13,500 miles, based on Oregon's average residential rate of 16.32¢/kWh and the EPA rating of 48 kWh/100 mi. A full charge (222 miles of range) costs around $17.23. That is $1,942 a year less than a typical 23 MPG gas car at Oregon's $5.09/gal.

Per month$87
Per mile7.8¢
Full charge$17.23
vs. gas car / yr−$1,942

Your Recon charging cost in Oregon

Public DC fast charging is often 40–60¢/kWh
Estimated cost per month
—
Per year—
Per mile—
Per 100 miles—
Full charge (≈222 mi range)—

Recon charging cost in nearby-ranked states

See the 2026 Jeep Recon in all 50 states →

Cheapest EVs to charge in Oregon

FAQ

How much does it cost to charge a 2026 Jeep Recon in Oregon?

Charging a 2026 Jeep Recon at home in Oregon costs about $87 per month ($1,048 per year) for 13,500 miles, based on Oregon's average residential rate of 16.32¢/kWh and the EPA rating of 48 kWh/100 mi. A full charge (222 miles of range) costs around $17.23. That is $1,942 a year less than a typical 23 MPG gas car at Oregon's $5.09/gal.

Is Oregon a cheap state to charge an EV?

Oregon ranks #26 of 50 states for the cost of charging a 2026 Jeep Recon at home (1 = cheapest).

Does public fast charging cost more?

Yes. DC fast chargers usually cost several times more per kWh than home charging, so drivers who rely on them can pay two to three times the home estimate. Use the calculator to enter your own price.