Home › EV charging › Utah › Acura ZDX

Cost to charge a 2026 Acura ZDX in Utah: $57/month

Charging a 2026 Acura ZDX at home in Utah costs about $57 per month ($680 per year) for 13,500 miles, based on Utah's average residential rate of 13.37¢/kWh and the EPA rating of 38 kWh/100 mi. A full charge (323 miles of range) costs around $16.28. That is $2,243 a year less than a typical 23 MPG gas car at Utah's $4.98/gal.

Per month$57
Per mile5.0¢
Full charge$16.28
vs. gas car / yr−$2,243

Your ZDX charging cost in Utah

Public DC fast charging is often 40–60¢/kWh
Estimated cost per month
—
Per year—
Per mile—
Per 100 miles—
Full charge (≈323 mi range)—

ZDX charging cost in nearby-ranked states

See the 2026 Acura ZDX in all 50 states →

Cheapest EVs to charge in Utah

FAQ

How much does it cost to charge a 2026 Acura ZDX in Utah?

Charging a 2026 Acura ZDX at home in Utah costs about $57 per month ($680 per year) for 13,500 miles, based on Utah's average residential rate of 13.37¢/kWh and the EPA rating of 38 kWh/100 mi. A full charge (323 miles of range) costs around $16.28. That is $2,243 a year less than a typical 23 MPG gas car at Utah's $4.98/gal.

Is Utah a cheap state to charge an EV?

Utah ranks #3 of 50 states for the cost of charging a 2026 Acura ZDX at home (1 = cheapest).

Does public fast charging cost more?

Yes. DC fast chargers usually cost several times more per kWh than home charging, so drivers who rely on them can pay two to three times the home estimate. Use the calculator to enter your own price.